Jurby WaterTech International continues shipment of equipment for Almaty CHP Plant 2. It is important to note that our company has performed a full range of works, including design and manufacture, under project “Reconstruction and expansion of WTP for boiler make-up with the use of membrane technology for water treatment at Almaty CHP Plant 2”. This project is a part of a large-scale program to reconstruct and develop Almaty CHP Plant 2 of AlEC (Almaty Power Stations) JSC. The water treatment plant (WTP) is intended for production of demineralized water. The design capacity of equipment will amount to 200 m3/h.
